All charts come from a single specification, from which both the SVG and an equivalent table («Show data») are generated. Each chart’s title is its conclusion, with the engine’s figures; the subtitle gives the plan, the measure, the notation and the year.
What each chart answers
| Chart | Question | How to read it |
|---|---|---|
| V1. Payout curve | How much do I earn at each attainment level, and where am I? | Attainment across, variable pay up. Vertical lines at the threshold, quota and cap. Jumps show an open circle (the value not reached) and a filled one, never joined by a line. |
| V2. Marginal rate | How much do I earn for each additional 1,000 in sales? | Steps by tier. Areas that pay nothing are hatched. |
| V3. Bullet graph | Where are my sales compared with the milestones? | Sales bar over grey bands: no variable, threshold to quota, above quota and cap. The vertical line marks quota. |
| V4. Variance | Am I above or below, by how much and for whom? | Actual or forecast minus plan, in euros, in % and in points. Sign and arrow, as well as colour. |
| V5. Cost waterfall | What makes up the total cost? | Items that add up to the total. VAT and withholding are shown apart, marked «not part of the cost». |
| V6. A/B | Which plan costs less at each sales level? | Above, the curves of A (solid) and B (dashed); below, B minus A with the zones and their exact limits (crossovers and changes). |
| V7. Cost to sales | What share of sales goes on pay? | One curve per plan, split at the jumps. |
| V8. Scenario table | Exact figures | One row per scenario, with in-cell bars and the «Your case» row. |
Actual, forecast and plan
Adapted IBCS notation: actual (AC) with solid fill, forecast (FC) with hatched fill and plan (PL) as reference lines and outlines. The «actual / forecast» box in «Your case» sets the fill on screen, in the PDF and in the PNG.
Dual perspective
The «View as: Company | Salesperson» switch does not change any figure. Sign and arrow say whether something goes up or down; colour says whether that is favourable or unfavourable for the person you choose:
| If this goes up… | For the company | For the sales rep |
|---|---|---|
| Sales | favourable | favourable |
| Variable pay | unfavourable | favourable |
| Total pay | unfavourable | favourable |
| Cost to the company | unfavourable | neutral |
| Cost to sales | unfavourable | neutral |
Palette
Blue #0072B2 and orange #D55E00 from the Okabe-Ito palette, which people with the most common types of colour blindness can tell apart; plan A in solid blue and plan B in dashed #9A6700. Contrast measured in light and dark themes: at least 3:1 for strokes and 4.5:1 for text. Colour never works alone: plan B is dashed, forecasts are hatched and variances carry a sign and an arrow.
Difference from IBCS: the standard uses green and red for favourable and unfavourable. Here blue and orange are used, because of colour blindness, and the meaning depends on the chosen perspective.
Accessibility
Each chart is a figure with a title, a visible long description and its equivalent table. The 14 critical Chartability heuristics have been reviewed one by one, with system forced colours and no motion when the system asks for it.
Formats
- PDF report: from the browser («Save as PDF»). Cover with date and time, versions and the sha256 of the inputs; executive summary; «Your case»; curve and rates; cost; A/B; alerts; risks; assumptions and methodology; inputs and legal framework; annexes with the scenarios, the chart tables, provenance and the glossary. Chrome and Edge number the pages; Firefox and Safari do not, and the tool says so. Chrome produces a tagged PDF; we do not claim PDF/UA.
- Plan sheet: one page per plan for the sales rep, with the curve, examples at 80, 100 and 120% and «Your case».
- CSV: one file per table (scenarios, tiers, cost, A/B and alerts),
sca_<date>_<table>.csv, in your language’s format or in a technical format (comma, decimal point and English headers). - SVG and PNG: each chart, for screen or for a 16:9 slide (PNG at 1,920 × 1,080, or 3× on request), with title, subtitle and a source note: engine, legal dataset, date and the first 12 characters of the inputs’ sha256.
- JSON: the master format, with a public schema. Data format.
How to verify the hash
The inputs sha256 carried by the report, the exported charts and the JSON file is that of the inputs object in canonical form (RFC 8785). Download the JSON with the same inputs and compare provenance.inputs_sha256. When a JSON file is loaded, the tool recomputes the hash and the results and warns if anything does not match.